Construction on the South Atlantic Cable System (SACS), which is a 40 Tbit/s, 6,165 km cable connecting Angola to Brazil, is now 75% complete. It is expected to enter service in mid 2018.
SACS offers four fibre pairs, with each fibre pair capable of transmitting 100 wavelengths with a bandwidth of 100 Gbit/s, which will connect from Angola to Brazil. SACS is scheduled to be ready for service in mid-2018.
NEC, which is the turn-key contractor for the project, has hired Orange Marine, to commence the deep water laying of the cable.
Share this article
Help others discover this reporting.
Editorial responsibility
Staff
Editor & Publisher
Every article published by Converge Digest is researched, curated, fact-checked and editorially reviewed by Jim Carroll, Editor & Publisher. AI-assisted drafting may be used to accelerate production, but all content is reviewed, refined and approved prior to publication.
You just read about Cable. Here is what it replaced:
Open-wire lines served 1880–1980. What ultimately replaced it?
Open-wire lines bare copper conductors bolted to glass insulators on wooden crossarms; wires were periodically transposed (crossed over) to cancel crosstalk and interference. Weather-exposed and very low capacity. Its job passed to Cable — but the problem it solved, and the ideas it proved, live on in what replaced it. The standard rests here in the archive. One of 198 technologies here that opened a door and then held it for the next.