Tiscali signed a strategic framework agreement with ZTE for the deployment of an FTTH network in Sardinia. The contract was signed in the presence of the Italian Prime Minister Silvio Berlusconi and Chinese Prime Minister Wen Jiabao, who is visiting Italy.
In the first phase of the project, the FTTH deployment will leverage ongoing work for the local gas network in the extended Cagliari area. This will include over 50 thousand lines of LLU (Local Loop unbundling) coverage. http://www.zte.com.cn
Share this article
Help others discover this reporting.
Editorial responsibility
Staff
Editor & Publisher
Every article published by Converge Digest is researched, curated, fact-checked and editorially reviewed by Jim Carroll, Editor & Publisher. AI-assisted drafting may be used to accelerate production, but all content is reviewed, refined and approved prior to publication.
You just read about Tiscali. One of the companies whose work it now carries:
World Online built Consumer dial-up Internet access, portals and pan-European ISP operations. What became of it?
World Online brought Consumer dial-up Internet access, portals and pan-European ISP operations to ISP. That work was distinctive enough to lead to its acquisition by Tiscali for €5.9B. The standalone name now passes into the archive — but the team and technology continue inside Tiscali today. One of 430 names here whose work outlived the company.
You just read about FTTH. Here is what it replaced:
ADSL / ADSL2+ served from 1999. What ultimately replaced it?
ADSL / ADSL2+ split the copper-loop spectrum into hundreds of DMT subcarriers, assigning most bandwidth downstream; reach and rate fell off sharply with loop length. Its job passed to FTTH — but the problem it solved, and the ideas it proved, live on in what replaced it. The standard rests here in the archive. One of 198 technologies here that opened a door and then held it for the next.