• Home
  • About
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Manage Email Delivery
  • NextGenInfra.io
No Result
View All Result
Converge Digest
Wednesday, June 10, 2026
  • Home
  • About
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Manage Email Delivery
  • NextGenInfra.io
No Result
View All Result
Converge Digest
No Result
View All Result

Home » Flex Debuts 33 kW Power Shelf for NVIDIA Blackwell, Prepares for 800 VDC

Flex Debuts 33 kW Power Shelf for NVIDIA Blackwell, Prepares for 800 VDC

August 5, 2025
in Data Centers
A A

Flex unveiled a new high-efficiency power shelf for NVIDIA’s GB300 NVL72 platform at OCP APAC in Taipei. The system is designed to meet the rising power and cooling demands of large-scale AI infrastructure, delivering up to 33 kW per shelf with peak efficiency of 97.5% at half load. It supports NVIDIA’s latest rack-scale system with 72 Blackwell Ultra GPUs while reducing power conversion losses by over 60% compared to conventional systems.

The announcement marks an important step toward 800 VDC data center power infrastructure, which will be needed to support 1 MW racks for AI workloads. Flex is working with NVIDIA to align production of 800 VDC components with the upcoming Kyber rack-scale systems, ensuring seamless adoption of higher-voltage architectures.

Flex is positioning its advanced manufacturing, power, and cooling portfolio as a comprehensive solution for hyperscale and colocation operators. Its grid-to-chip power systems and lifecycle services aim to accelerate the deployment of AI factories worldwide.

• New Flex power shelf supports NVIDIA GB300 NVL72 with 72 Blackwell Ultra GPUs

• Delivers 33 kW per shelf, with six PSUs in a 3+3 redundant design

• Achieves 97.5% efficiency at half load, cutting conversion losses by 60%

• Prepares industry for transition to 800 VDC infrastructure and 1 MW racks

• Full-scale production to align with NVIDIA Kyber rack-scale systems

“As AI workloads push rack power systems to new levels, Flex is at the forefront of enabling data center operators to overcome increasing power, heat, and scale challenges,” said Chris Butler, president, Critical and Embedded Power at Flex.

🌐 Why it Matters: As AI factories scale toward megawatt racks, the transition to 800 VDC power infrastructure is becoming critical. Flex’s collaboration with NVIDIA highlights how power system innovation must keep pace with GPU density and rack-scale AI system evolution.

🌐 We’re tracking the latest developments in AI infrastructure and data center power systems. Follow our ongoing coverage at: https://convergedigest.com/category/data-centers/

ShareTweetShareSummarizeSummarize
Previous Post

Astera Labs Q2 Revenue Jumps 150% YoY as PCIe 6

Next Post

Nokia Powers Empyrion’s KR1 Gangnam Data Center in Seoul

Jim Carroll

Jim Carroll

Editor and Publisher, Converge! Network Digest, Optical Networks Daily - Covering the full stack of network convergence from Silicon Valley

Related Posts

All

SpaceXAI Details Gigawatt-Scale AI Data Centers in LEO

June 8, 2026
AI Infrastructure

Google and Intersect Launch New Texas Data Center Campus with 1 GW+ Dedicated Energy Capacity

June 8, 2026
Semiconductors

Cadence, Intel Foundry Deepen Partnership to Optimize Intel 14A

June 8, 2026
All

Qnity Unveils Advanced Packaging Materials

June 8, 2026
5G / 6G / Wi-Fi

MACOM Intros Hot Via Chip Scale Tech to Eliminate Wire Bonds at mmWave

June 8, 2026
AI Infrastructure

Stark Power to Acquire Sagebrush Infra, Securing 5.6 GW U.S. Data Center Pipeline

June 8, 2026
Next Post

Nokia Powers Empyrion’s KR1 Gangnam Data Center in Seoul

Categories

  • 5G / 6G / Wi-Fi
  • AI Infrastructure
  • All
  • Automotive Networking
  • Blueprints
  • Clouds and Carriers
  • Data Centers
  • Enterprise
  • Explainer
  • Feature
  • Financials
  • Last Mile / Middle Mile
  • Legal / Regulatory
  • Optical
  • Quantum
  • Research
  • Security
  • Semiconductors
  • Space
  • Start-ups
  • Subsea
  • Sustainability
  • Video
  • Webinars

Archives

Tags

5G All AT&T Australia AWS Blueprint columns BroadbandWireless Broadcom China Ciena Cisco Data Centers Dell'Oro Ericsson FCC Financial Financials Huawei Infinera Intel Japan Juniper Last Mile Last Mille LTE Mergers and Acquisitions Mobile NFV Nokia Optical Packet Systems PacketVoice People Regulatory Satellite SDN Service Providers Silicon Silicon Valley StandardsWatch Storage TTP UK Verizon Wi-Fi
Converge Digest

A private dossier for networking and telecoms

Follow Us

  • Home
  • About
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Manage Email Delivery
  • NextGenInfra.io

© 2026 Converge Digest - A private dossier for networking and telecoms.

No Result
View All Result
  • Home
  • About
  • Events Calendar
  • Blueprint Guidelines
  • Privacy Policy
  • Manage Email Delivery
  • NextGenInfra.io

© 2026 Converge Digest - A private dossier for networking and telecoms.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
Go to mobile version